Detail

Location:Home > Detail

Dayaoshan Tunnel

Date:11-27-2018

With a total length of 14 kilometers, Dayaoshan Tunnel of Hengyang-Guangzhou Railway, started in 1981 and completed in 1989, at which time it was the longest electrified double-track railway tunnel in China. CREC independently built the entire tunnel and applied the New Austrian Tunneling Method for the first time to build long mountain railway tunnel and won the National Science and Technology Advancement Award.

Daoyaoshan Tunnel